PlantON™ / Production Visibility & OEE

Understand the loss before debating the OEE number.

One OEE number can hide disagreement. How running time, planned stops, counts, scrap and downtime are defined decides whether it helps a decision.

PlantON OEE dashboard with availability, downtime calculation and machine status
OEE, availability and downtime by machine

Technical starting point

A trusted OEE view begins with a trusted operating model.

Define the line or asset boundary, production calendar, planned time, machine states, rate basis and quality counts. Confirm data timestamps and ownership before committing to a KPI. Missing or inconsistent source signals should be treated as design work, not hidden by graphics.

Explore our engineering phases
PlantON loss analysis dashboard from planned time to fully productive time

Technical considerations

What the application has to address.

Typical scoping questions. The answers shape the scope, deliverables and acceptance criteria for your project.

01

Model the process states

Agree the definitions for running, blocked, starved, changeover, cleaning, maintenance and planned downtime.

02

Assess source quality

Check PLC signals, counts, histories, timestamps, quality inputs and links to product or work-order context.

03

Make downtime actionable

Use a practical reason model with clear human and automatic inputs. Count planned and unplanned stops separately, treat short stops below an agreed threshold as performance loss, and calculate availability as run time divided by planned production time.

04

Support different users

Provide appropriate views for operators, supervisors, engineers and management without forcing one report to serve everyone.

Every project requires a defined technical owner, acceptance basis and a scope proportionate to its operating context.

Scope logic

From an engineering question to an operating system.

The aim is to distinguish what is known, what must be engineered and what evidence is needed next.

01 / APPLICATION LAYER

Line or asset audit

What the equipment can actually report, and where the critical gaps are.

02 / APPLICATION LAYER

KPI and event definitions

Clear and agreed rules for availability, performance, quality and reasons.

03 / APPLICATION LAYER

Phased visibility

A limited operating view first, checked against real events before a broad deployment.

Delivery sequence

A practical path toward the next decision.

  1. 01Choose one line and the decision to support
  2. 02Audit available machine states, rates and counts
  3. 03Agree data definitions and ownership
  4. 04Test reporting against real production records

Contract stages remain separate. Progression from Basic Engineering & Feasibility to Detailed Engineering or Integrated Design & Build is not automatic.

First conversation

Start with the evidence already available.

A useful first discussion is about the existing basis, the technical uncertainty and the milestone it affects. A complete specification is not required to start clarifying the scope.

Prepare a technical enquiry
Useful inputs to bring
  • Machines or lines to be included
  • Current shift and production reports
  • Available PLC/SCADA or database signals
  • Known discrepancies in counts or downtime

Common questions

Decisions worth clarifying.

Can OEE be calculated from existing PLC data?

Possibly. It depends on the availability and quality of states, production counts, schedule, rate basis and quality information.

Does an OEE project have to start plant-wide?

No. A bounded line or asset group often allows the operating model and data quality to be validated before expansion.